Published research / United Kingdom
Industrial dock
ConocoPhillips Teesside docking trial
A 90-day DJI Dock 2 trial at the Teesside Oil Terminal studied remote inspections of a tank farm. This historic trial does not establish current operation.
Reported infrastructure
A 90-day DJI Dock 2 trial at the Teesside Oil Terminal studied remote inspections of a tank farm. This historic trial does not establish current operation.
Read original source ↗Evidence and limitations
Source-reported project. Current operation, exact station locations, site access and flight permissions are not independently verified. The map uses an intentionally broad-area marker.